Porsche: Porsche ◆ My Porsche 911 Carrera T (992.1) ◆Porsche 911 (992.1 model)

Porsche purchase note 3: Completion of the Porsche 911 production process

Posted: April 5, 2023 Updated:

This article continues below:
Porsche purchase note ①: I received a production frame in March 2023
Porsche purchase note 2: Production start of Porsche 911

The number of days it took to manufacture the Porsche 911 was 4 days

Well, the situation of the Porsche 911 (992 type) that I am currently ordering is as follows.

  • As of January 12, 2023:01 The production month of the vehicle is confirmed (the date on MyPorsche isNovember 22, 2022and for some reason it started after it was written in a fairly back date)
  • As of March 6, 2023:02 Reached the final acceptance deadline for specification changes (the date on the app isMarch 3, 2023)
  • As of March 29, 2023:03 Start your Porsche production (date on the app isMarch 28, 2023)

At this point, I was able to confirm the actual situation with my sales representative in charge of the new car, but when he confirmed on March 28, 2023 (Japan time), he said, "The production plan has been completed. ’, meaning that production had not yet started.

I was looking forward to it because production would start within two weeks from there.

How.

Every day (insanity that I've been checking many times (laughs)), when I checked on March 31, 2023, the status suddenly changed to "production process completed".

Hey, have you started yet? So are you done? ?

I also asked the sales person to confirm, but the status that the sales person can see actually changed to "Arrived at the depot" as of March 31st.

The depot is said to mean the starting point for departures to Emden Port. I don't know where.

Here is the explanation of the completion of the production process with status 04/08 displayed on my app ↓

Judging from the actual status confirmed by the sales person, production had not started yet on March 28 (Japan time), and it had arrived at the depot on March 31 (Japan time). Therefore, even if I think for the longest time, my Porsche 911 was completed in four days from "March 28th to March 31st" in German time.

The previous Porsche 911 Cabriolet (992) took about 6 days to complete, so it was completed much earlier than that. 4 days (there were too few options (laughs)?)

An image of the production stage of the Porsche 911 is sent

Images of the production stage were sent as soon as this status changed to 04.

Now I am playing with various people about the model and color of the Porsche 911 that I am ordering this time. I'm sorry, but these are the 4 photos that were sent to me.

All the colors are painted red and then blurred, so the actual color may not be red, and it may be red ^ ^

I have arranged the information in the photos you have sent.

It seems that "Canon EOS-1D X Mark II" is taking pictures of these production processes.

All the conditions were the same, but "aperture value 1/4, exposure time 1/125 second, ISO 500, focal length 45 mm, metering mode spot, no flash, 35 mm focal length".

The times when the photos were taken are summarized below.

photo numberShooting date and time
March 30, 2023 3:00
March 30, 2023 10:20
March 30, 2023 13:43
March 30, 2023 14:54

It took 7 hours and 20 minutes from painting to assembly (① → ②), but after that it was fast. so fast. That's amazing.

Anyway, I'm glad to see that production of the Porsche 911 is finally complete. I'm grinning all the time.

Looking at the next schedule, Status 05 "Start transportation of finished vehicles" is from March 30th to April 1st.

It's already April 5th, so I'm sure I'm late, but I'm looking forward to the day when I can move on to the next status ^^

Even after arriving in Japan, I'm considering various tequipments that I want to add to the 911 this time, so I'm in a hurry to move on about them.

Current status is as follows:

  • As of January 12, 2023:01 The production month of the vehicle is confirmed (the date on MyPorsche isNovember 22, 2022and for some reason it started after it was written in a fairly back date)
  • As of March 6, 2023:02 Reached the final acceptance deadline for specification changes (the date on the app isMarch 3, 2023)
  • As of March 29, 2023:03 Start your Porsche production (date on the app isMarch 28, 2023)
  • As of March 31, 2023:04 Completion of the production process (the date is also displayed on the app)March 31, 2023)

I'm looking forward to it too! !

ContinuedPorsche purchase note ④: Start transportation of Porsche 911 complete car

Related article:
Porsche purchase note ①: I received a production frame in March 2023
Porsche purchase note 2: Production start of Porsche 911
Porsche purchase note 3: Completion of the Porsche 911 production process
Porsche purchase note ④: Start transportation of Porsche 911 complete car

My Porsche and Track Your Dream may only apply to Porsches produced at the Zuffenhausen factory (as of December 2022)
Photos delivered with My Porsche/Track your dream
Track Your Dream can be used with My Porsche even when ordering from Japan
So that you can see your Porsche production process in "My Porsche"

On 911 Supercars


On 911 Supercars


911Supercars in the article



-Porsche: Porsche, ◆ My Porsche 911 Carrera T (992.1), ◆Porsche 911 (992.1 model)

en_USEnglish

Copyright© 911 Supercars | Porsche Blog, 2024 All Rights Reserved Powered by STINGER.